• 3dbg
    In-Pit Crushing and Conveying System
  • 2
    Providing the world's most professional services to the coal processing technology
  • slidebg1
    Providing the world's most professional services to the coal processing technology
  • 3dbg
    Providing the world's most professional services to the coal processing technology

EPC project on CHPP

For turn-key project, TGT are full responsibility for design, engineering, procurement, construction and commissioning of the project. TGT project managers are skilled and experienced in the coal industry. TGT project managers use advanced project management technology to guarantee that each job is completed on time with first class quality.

Projects undertaken by TGT include new coal preparation plants, up grades to existing plants, overland conveying system as well as coal and coke storage, handling and reclaim facilities.

Process Equipment

TGT has set up strategic partnership with many leading equipment companies in China for a complete line of coal processing equipment. The main kinds of equipment are as follows:

  • Screens
  • Heavy Medium Vessel
  • Magnetic Separator
  • Crusher
  • Screen Bowl Centrifuge

Operations

TGT' s technical staff has extensive hands-on plant operating experience.This resource is utlized during the commissioning of processing plants and also in the development of plant-specific training programs for operating and maintenance personnel.

TGT can provide plant contract operation service on a continuing basis or for a build/operate/ transfer scenario.

Our coal preparation projects

TechGart has constructed 86 coal preparation plants in EPC contract.

TIANJIN EQUIPMENT FACTORY

TechGart (Tianjin) Industrial Technology Co.,Ltd is a 100% subsidiary of TGT and  focus on process equipment manufacture. Basis on our process experiences and close cooperation with world famous process brands, we can provide kinds of high quality process equipment in China, such as Dense Medium Vessel, kinds of Screens, Centrifuge, Magnetic Separator, Slurry Separator, Dense Medium Cyclone, Classifying Cyclone. And we also help our clients to reduce equipment cost beside upgrade the quality.

NEWS

TechGart Successfully Signed the Russian CPP Project

14 July, 2017

This project is located in the Russian Far East, high altitude, poor weather conditions, the minimum temperature of minus 60 degrees, and about two months each year at a temperature of minus 30 degrees. Rainy season is rich in precipitation, and the tundra is up to 5 meters deep. Under such tough conditions, the construction of the coal preparation plant is a great challenge, TechGart company with its strong design capability and strong technological forces finally won the recognition of the owners.

The project is a large-scale coking coal preparation plant, with using of Heavy Medium Cyclone and Flotation process, the scale reached 6.0Mt / a, and the construction duration will last 10 calendar months.

TechGart will stay focused on maintaining its consistent style, rigorous design, innovative manufacturing, and first-class construction management, and strive to provide a perfect project for the owners. Meanwhile, TechGart also devotes itself to introducing China's excellent washing technology and project management capabilities to the world!

Continue Reading...

Successful Trial Operation of Jinjitan CPP Phase II

30 June, 2017

On 30 June, the Future Energy Jinjitan, coal preparation plant phase II held the joint debugging ceremony, which marked the project equipment installation work is over and the project would come to the debugging production stage.

Jinjiatan Coal Mine Coal Preparation Plant Phase II project is not only the key project of Future Energy, but also the key construction project of Yuyang District Government in 2016, TechGart is the general contractor of this project. The project started construction on 27 June, 2016 with Investment of 350 million yuan and construction period of 10 months. After completion, the main products for the election are the lump coal in 30-80mm and smalls below 30 mm, and after washing the clean coal calorific value will be in 6500 kcal or more. This project adopts heavy medium vessel separation process, equipment contain heavy medium vessel, desliming screen, centrifuges and other imported assembly equipment. In the case of good coal quality in stable condition, it is possible to subdivide the variety structure from the bypass system. Various production, safety and equipment protection monitoring and monitoring equipment are entered the centralized control system, and use the world-class level, stable and reliable control components to achieve the digital management of the whole plant.

Continue Reading...

Weiqiang CPP Won the National Coal Industry "Sun Cup" and High-quality Projects Awards

25 June, 2017

China Coal Construction Association, Coal Industry Construction Engineering Quality Supervision Station announced the 2015-2016 Coal Industry High-quality Project and the "Sun Cup" project winners. The Weiqiang coal preparation plant (3.0Mt / a) which was general contracted by TechGart (BeiJing) Engineering Ltd won the "Sun Cup" and Coal Industry High-quality Project awards.

Continue Reading...

Clients - Our Partners

  • 华电集团
  • 山西煤销集团
  • 潞安集团
  • 中煤集团
  • LESTARI_INDONESIA
  • 大同煤业
  • 兖矿集团
  • 神华集团

There are some of our partners and customers, who are very satisfied with our work.
Do you want to be next one ?